Weapons of Mass Destruction in DC

Mar 20, 2008

Hopkins Proposes Tracking Program

›
Spring Valley Public Health Scoping Study (May 2007) Members of the Spring Valley Restoration Advisory Board received a proposal last week f...
Mar 19, 2008

April Vote Set on Health Study

›
A Spring Valley health study proposed by Ward 3 Council member Mary Cheh is not getting the kind of resounding support some expected as a ma...
Feb 29, 2008

Weapon Stockpile Still Missing

›
"Almost 800 barrels of soil have been sampled and removed. We did not find what we anticipated: stacked rounds of a couple hundred buri...
Feb 14, 2008

Numerous "Anomalies" Detected

›
Ed Hughes, program manager of the Army Corps' Baltimore district, said his team received an indication from geophysical and chemical tes...
1 comment:
Jan 23, 2008

Digging Resumes at Munitions Pit 3

›
After the MARB results determined that the munition of concern is an explosively configured 75 mm chemical projectile with an arsine fill, ...

Interim Holding Facility (IHF)

›
The U.S. Army Corps of Engineers is storing World War I chemical weapons excavated from the nearby Spring Valley community inside this tent-...

Aerial View of Property Around Interim Holding Facility

›
U.S. government property surrounding Dalecarlia Reservoir where the Army Corps of Engineers is keeping chemical weapons that are unearthed ...
‹
›
Home
View web version

About Me

My photo
Allen Hengst
"Enoch made them, and Enoch shall break them."
View my complete profile
Powered by Blogger.